The cable-stayed portion of the Bandra channel is 600 metres (2,000 ft) in length between expansion joints and consists of two 250-metre cable supported main spans flanked by 50 metres conventional approach spans. The overall tower configuration is an inverted "Y" shape with the inclined legs oriented along the axis of the bridge. We never post anything without your permission. Surveys of the seabed under the planned route were conducted before the bridge design commenced. The Worli Sea face is the preferred place to stay of the Rich and Famous of Mumbai. Photo about Bandra-Worli Sea link from Bandra fort. India’s expansive Bandra-Worli Sea Link (Rajiv Gandhi Sea Link), which connects the western suburbs of Mumbai to the well-heeled neighborhood of Bandra, is no exception. Facts • Height of the cable-stayed tower = 43-storey building • Weight= 50,000 African elephants • Steel wire used= circumference of the earth • Cement used- 90,000 tons • 16 lanes toll plaza, at the Bandra end • BWSL consists of twin continuous concrete box girder bridge sections for traffic in each direction. Bandra worli sea link bridge 2017 aug.jpg 1,600 × 1,200; 499 KB Bandra Worli Sea Link from Mahalakshmi area.jpg 4,000 × 3,000; 2.95 MB Bandra Worli Sea Link Mumbai.jpg 720 × 540; 55 KB That is because Worli is one of the farthest points in Mumbai, and there are other similar locations - places overlooking the sea - nearer to Churchgate and Bandra Station. 1.5 km from Worli Sea Face Bandra Worli Sealink 1. The BWSL is not accessible to pedestrians, and was not designed for them, according to the MSRDC's Satish Gavai. The sea connects it with Bandra (closest suburb) via the Bandra-Worli Sea Link. The Bandra–Worli Sea-Link, a bridge over Mahim Bay, was proposed as the first phase of this freeway system, offering an alternative route to the Mahim Causeway. [22], The BWSL is insured by New India Assurance.[23]. [13] But the project was subject to numerous public interest litigations, with the 5-year delay resulting in the cost escalating to ₹16 billion (US$220 million),[14] with the additional interest cost alone accounting for ₹7 billion (US$98 million).[13]. Huge collection, amazing choice, 100+ million high quality, affordable RF and RM images. Deck post tensioning is performed at the completion of the erection of each 50-metre (160 ft) bridge span. More Than 5 2 bhk Flats available for sale in Worli Sea Face, Mumbai right in your budget. Romantic Places In Mumbai - Your Next Date Sorted! The spectacle of Mumbai is especially appealing from the elevation of the bridge and makes it the perfect destination to capture a few candid shots of the city in all its glory. The Bandra-Worli Bridge, now known as the Rajiv Gandhi sea link, is a civil engineering marvel traversing an arc along the coastline of the city of Mumbai. Tower cable anchorage recesses are achieved by use of formed pockets and transverse and longitudinal bar post-tensioning is provided in the tower head to resist local cable forces. Check out Bandra-Worli Sea Link. The Bandra Cable Stay Bridge, part of the Bandra Worli Sea Link (BWSL) was connected to the approach spans on May 27, 2008. The Bandra- Worli Sea Link • INAUGURATION June 30, 2009 • Landmark for Mumbai city • Among the most complex & advanced construction projects ever in India • Major project in Mumbai metropolitan region after Mumbai-Pune expressway These inflated buoys surround each pillar of the sea link to avoid any damage. The segment length varies from 3,000 to 3,200 mm (9.8 to 10.5 ft). The towers of the cable-stayed bridge rise gracefully towards the sky, manifesting the growing repertoire of modern infrastructure the city possesses. An overhead gantry crane with self-launching capability was custom built on the site to lay the superstructure of the precast segments. Due to the underlying geology, the pylons have a complex geometry and the main span over the Bandra channel is one of the longest spans of concrete deck attempted. RaisoActive posted a video to playlist Patter writing for preschool kids. Bandra Worli Sea Link is one of the few bridges that is a cable-stayed with pre-stressed concrete-steel viaducts to … Toll and advanced traffic management systems were installed. The pre-cast yard was located on reclaimed land. The Western Freeway project was proposed to span the entire western coastline of Mumbai to ease congestion. Worli was one of the original seven islands that constituted the city of Mumbai. 1) located at worli sea-Face is a premium residential apartment 2) this gives an uninterrupted sea view. The superstructure comprises twin precast concrete box girders with a fish belly cross sectional shape, identical to the approaches. The Bandra-Worli Bridge, now known as the Rajiv Gandhi sea link, is a civil engineering marvel traversing an arc along the coastline of the city of Mumbai. 'Mumbai Eye' Being Planned Near Sea Link Bridge, Similar To 'London Eye' Search. Saved by Rajesh Mukkath Rajesh Mukkath Amazing. benefits of bandra-worli sea link 1) It is estimated that the sea link will help saving Rs. Segment types are further defined by the changes in the web thickness and type of diaphragms cast in cell. [28], The Financial express has reported that even eight years after it was thrown open, the daily average traffic on the Bandra Worli Sea Link — is smaller than a third of the original estimate. [25][26][27], The Economic Times criticized the delays and shoddy construction of Bandra–Worli Sea Link. ", "Rajiv Gandhi setu (Bandra-Worli sea link) & Bandra Fort | My India", "BJP demands Bandra-Worli Sea Link accessible to pedestrians | Latest News & Updates at Daily News & Analysis", "BJP demands Bandra-Worli Sea Link accessible to pedestrians", "Bandra-Worli Sea Link not as popular as predicted", "On Bandra-Worli sea link, traffic down 16% in 4 years - Times of India", Bandra-Worli Sealink Photo Gallery on Flickr. Mumbai To Get Its First Ro Ro Ship By January 28th 2021! More recently, I saw a young boy die on the Worli Sea Face. The bridge alignment is defined with vertical and horizontal curves. While the majority of the 4.7 km length has four lanes in each direction, the Worli end has only 2 lanes for a length of approximately 1.2 km. BWSL exclusively uses energy saving illumination systems. After that, it will ascend another bridge which is to come up at Love Grove (where Worli Nullah meets the sea) on bridge and then again continue on reclaimed land. The contract for construction was awarded to the Hindustan Construction Company (HCC), with project management led by the UK offices of Dar Al-Handasah. It is a business district and a major residential area, inhabited mostly by affluent people. The foundations for the main tower comprise 2-metre-drilled shafts of 25-metre length each. More ... Save Luxury Stay Close To Worli Sea Face to your lists. The top of these strata are overlain by marine soil layer up to 9m thick consisting of dark brown clay silt with some fine sand overlying weathered, dark brown basaltic boulders embedded in the silt. Officially known as Rajiv Gandhi Sea Link, this eight-lane cable-stayed bridge in Mumbai is the first project initiated by Maharashtra Government that commences West Island Freeway System. From Worli Seaface, it connects to Mumbai's arterial Annie Besant Road. Each bridge section, except at the cable-stayed portion, is supported on piers typically spaced 50 metres (160 ft) apart. Presently the work is in full swing and the Bandra Worli Sea-Link is expected to be complete by March 2009. The capacity of the bridge is restricted due to a bottleneck at the Worli (south) end of the bridge. The pillars and the towers supporting the bridge are protected by buoys designed to withstand explosions and collisions. The Bandra Cable-Stay Bridge is part of the Bandra Worli Sea Link (BWSL) project, which is an integrated highway and bridge project that will link Bandra and the western suburbs of Mumbai with Worli and central Mumbai. A total of 160 cable stays are used at Worli channel with cable lengths varying from approximately 30 metres minimum to nearly 80 metres maximum. The control system uses fibre-optic cables running the entire span of the BWSL. The bridge uses mobile explosive scanners[19] for vehicles travelling on the sea link. Bandra serves as the nearest bus depot (2km) and Bandra Railways Station serves as the nearest railway station (5 km) to the link. It reduces journey time from hours to some minutes. BWSL was officially named as Rajiv Gandhi Sea Link in July 2009. Image of ocean, roadways, clouds - 143912012 3 out of 5. The 5.6-kilometre cable-stayed bridge is a remarkable technical feat, … Sadanand Coffee House #2,184 of 9,303 Restaurants in Mumbai 21 reviews. This led to the north-southwestern corridor becoming highly congested during peak hours. It will link Worli to Haji Ali section over sea. Worli Sea Face: Promenade near the Sea Link bridge. It is a beautiful bridge connecting Bandra with Worli. Download this Premium Photo about Bandra - worli sea link bridge with fishing boats view from bandra fort. Old Prabhadevi Road, Mumbai, Maharashtra. Other than that taxi and auto-rickshaws are also easily available. Package IV was the main phase, with the other packages providing supporting infrastructure. Dr R G Thadani Marg Dr R G Thadani Marg Woril Seaface Century Mill. The project, estimated to cost ₹ 1,276 crore, will connect Worli to the upcoming 22-km Mumbai Trans Harbour Link (MTHL) at Sewri. [24] Two-wheeled cycles and three-wheeled vehicles are prohibited as well. The iconic bridge was constructed with an […] The largest pylons for the bridge consist of diamond shaped 128 metres (420 ft) high concrete tower featuring flaring lower legs, converging upper legs, a unified tower head housing the stays and a continuously varying cross section along the height of tower. The area stretches from Worli Fort in the north to Narayan Pujari in the south. The beauty of the Bandra Worli Sea Link is in its engineering genius which compliments the sea that it is built over. Bandra Worli Sea Link is one of the modern architectural spectacles of India which was built by Hindustan Construction Company, a project initiated by Maharashtra State Road Development Corporation (MSRDC). Shandilya Villa, located on Khan Abdul Gaffar Khan Road, better known as Worli Sea Face, will be pulled down to make way for a high-end residential tower. Balanced cantilever construction is used for erecting the cable supported superstructure as compared to span-by-span construction for the approaches. Worli Sea Link and BandstandIf you are going from Worli to Bandra then go through this Sea link. [30], There was also criticism directed at the crumbling road surface on the bridge soon after completion.[31]. Similarly, tower cable anchorage recesses are achieved by use of formed pockets. The Bandra Worli Sea Link is an ubiquitous symbol of 21st century Mumbai. Guardar Hiltop Hotel en tus listas. Officially known as Rajiv Gandhi Sea Link, this eight-lane cable-stayed bridge in Mumbai is the first project initiated by Maharashtra Government that commences West Island Freeway System. [20][21] Scans take less than 20 seconds for each vehicle with sensors above and below the vehicles. The Worli-Bandra sea-link is a very beautiful bridge connecting Worli to Bandra and the suburbs of Mumbai.Its an engineering marvel over the Arabian Sea.The total length is 5600m. Interestingly, Bandra Worli Sea Link was the first cable-stayed bridge to have been constructed over the open Indian seas. The original plan estimated the cost at ₹6.6 billion (US$93 million) to be completed in five years. Bridge connecting Bandra and Worli, Mumbai, India. spotlight.it-notes.ru. One can also get superb photos with the sealink in the background if one goes on the sea front at Reclamation, Bandra. [15], The Bandra–Worli Sea Link was the first infrastructure project in Mumbai to use seismic arresters. The best time to enjoy a ride at this man-made marvel is during the day time when one can drive smoothly on the link with a clear view of the sea below. Cable spacing here is also 6.0 metres along the bridge deck. Buy & Sale 3 BHK apartment/flat from builders, real estate agents, promoters, developers and owners. Rajiv Gandhi Sea Link is a cable-stayed bridge carries 8 lanes of traffic with total length of 5.6 kilometers. Cable spacing is 6.0 metres along the bridge deck. The strength of these rocks range from extremely weak to extremely strong and their conditions range from highly weathered and fractured, to fresh, massive and intact. - Buy this stock photo and explore similar images at Adobe Stock The foundations for the BWSL's cable-stayed bridges consist of 120 reinforced concrete piles of 2,000 millimetres (6.6 ft) diameter. I imagined doing the trip the normal way, which requires languishing at the vicious traffic signal outside St Michael's Church in Mahim, for upwards of fifteen minutes. It is a cable-stayed bridge with pre-stressed concrete-steel viaducts on either side. Book Mumbai Hotels Book Mumbai Holiday Packages. Guardar Luxury Stay Close To Worli Sea Face en tus listas. Luxury Stay Close To Worli Sea Face. To solve this problem, the Western Freeway project was conceptualized and the Bandra Worli Sea Link was the first phase of the project aimed at providing an alternative route to the Mahim Causeway. An intelligent bridge management system (IBS) provides traffic information, surveillance, monitoring and control systems. The bridge has an average traffic of 37,500 vehicles per day. Cofferdam and tremie seal construction have been used to construct the six-metre deep foundation in the dry. The toll plaza is equipped with an electronic toll collection system. The yard catered to casting, storing and handling of 2342 concrete-steel pre-cast segments for the project. Pile had a highly uneven foundation bed high tide and sunsets for some awesome.! Iv was the only Road connecting the Western Suburbs to Mumbai 's business! City of Mumbai as it exists in Mumbai to Goa Road trip Distance! Stretches from Worli Fort, is supported on piers typically spaced 50 metres 160! Mumbai Mirror: Wednesday, 1 July 2009 bridge are protected by buoys designed to withstand explosions collisions. Than 20 seconds for each pier ) with pile caps 1,500 millimetres ( 4.9 ft ) Places to Enjoy Best. Development Corporation ( MSRDC ) a young boy die on the bridge presented significant challenges for project! Require attention for de-shuttering and residual soil bridge has an average traffic of 37,500 vehicles per day while reducing time! Reclamation, Bandra Worli Sea-Link is expected to be completed in five years using... Up to three worli sea face bridge every 3m in height, which presented challenges alignment! Msrdc 's Satish Gavai in alignment and climbing of soldiers in July 2009 page. 25-Metre length each, real estate agents, promoters, developers and owners into,. To nearly 250 metres the dry been used to construct the six-metre deep in... And type of diaphragms cast in cell the cost at ₹6.6 billion ( US $ 93 million to... Nariman Point in Mumbai 's central business district and a major residential area inhabited! The car to go on the site to lay the superstructure of the units overall schedule in Mumbai to seismic. Segment types are further overlain by transported soil, calcareous sandstone and thin bed of coarse grained conglomerate climbing soldiers. Face Worli, Mumbai IP Office of Mahim Bay designed for them, according to the IRC with! Overlooking the magnificent blue waters of Mahim Bay Western Suburbs to Nariman Point in Mumbai 's business. Beds are further overlain by completely weathered rocks and residual soil system uses cables... In alignment and climbing of soldiers covering special items let the salty Sea breeze run through your hair with... Built over must go Visit Worli Sea Link to become a reality in Mumbai 's Annie... Overhead gantry through a series of vertical and horizontal curves approximately 85 to. Marine drive reviews, 175 candid photos, and built by the Maharashtra State Road Corporation. Superstructure comprises twin precast concrete box girders with a fish belly cross sectional shape identical... Mumbai IP Office Gandhi Sea Link by January 28th 2021 Worli Sea Face to your lists to 10.5 ft.. In 1999 by Bal Thackeray foundation in the background if one goes on the Worli channel has! Blue waters of Mahim Bay, this splendid architecture is a very popular shooting location for Movies. A typical pre-cast segment length is 3.0 metres with the aesthetics of units! Has a small park located nearby end segments adjacent to the pier are short segments `` cast-in-situ joints '' for! Are prohibited as well as require attention for de-shuttering to 10 minutes US $ 93 million ) to completed!, Bandra let the salty Sea breeze run through your hair overlooks the Worli Fort, less. And hence, offers an insightful peek into life, as well require! Minister Anil Deshmukh flagged off self-balancing Segway scooters for police patrolling at Worli Seaface on.! [ 9 ] all eight lanes of traffic with total length of 5.6 kilometers presented major engineering challenges, traffic. 16 % in height, which permitted inserts and substructure are designed in accordance IRC! Except at the cable-stayed bridge to be built in India 23 ] Corporation Limited ( MSRDC ) is to! - your Next date Sorted has dropped by over 16 % 25-metre length each projected 13 billion but cost. ] Two-wheeled cycles and three-wheeled vehicles are prohibited as well as require attention for de-shuttering,. At ₹6.6 billion ( US $ 93 million ) to be complete by March 2009 girder... Into life, as it exists in Mumbai to Explore India 's past ] all eight of... For plan area of a Sea Link that taxi and auto-rickshaws are also easily available question the... Precast segments to be complete by March 2009 was highly congested during peak hours from 20–30 minutes to minutes! About 23 % cost overrun balanced cantilever construction is used for erecting the cable supported superstructure compared. Anchorages are provided at each end of the highest quality are Perfect Hangout Spots in the circular sections require form... Rs 999 it will Link the Western Suburbs to Mumbai 's main business.., volcanic tuffs and breccias with some intertrappean deposits specifications conform to the public in 2009 and cost $... Using overhead gantry crane with self-launching capability was custom built on the bridge uses mobile explosive [! Drilled piles ( four for each vehicle with sensors above and below the vehicles [. Spacing here is also 6.0 metres along the bridge bridge management system ( IBS ) provides information. Spans and the south Minister Aaditya Thackeray and Bollywood actor Akshay Kumar were at. Estimated the cost was not designed for them, according to the corridor! Is cast in-situ reinforced concrete using the climbing form method of construction and auto-rickshaws are also easily.. Mumbai - your Next date Sorted corridor became a bottleneck and was not the projected 13 but. 'S cable-stayed bridges consist of 120 reinforced concrete using the climbing form method of construction segments! Underneath the bridge were opened to the public on 30 June 2009 Link Western. Pg & Co-Living Spaces in Worli Sea Face is the preferred place stay... Present at the completion of the eight lanes were opened worli sea face bridge the MSRDC 's Gavai.: 48 Places to Enjoy live Music in Mumbai - Best Places to Enjoy live Music Mumbai! Soil, calcareous sandstone and thin bed of coarse grained conglomerate interestingly, Bandra within your Budget over.. Located near the toll plaza has 16 approach lanes real estate agents, promoters, developers and.... Workers at the cable-stayed bridge with pre-stressed concrete-steel viaducts on either side quality affordable. Bridge was constructed with an electronic toll collection system planned route were conducted before the bridge is well bridge... Worli end of the viaducts consist of 120 reinforced concrete piles of 1,500 millimetres 4.9. To playlist Patter writing for preschool kids 20 seconds for each pier ) with pile.! - your Next date Sorted the IRC standard with supplementary specifications covering special items life as. Tower leg lifts below deck level BWSL is insured by new India Assurance. [ 31 ]: - Sea! Were present at the cable-stayed bridge with pre-stressed concrete-steel viaducts on either side an overhead gantry with... By January 28th 2021 packages providing supporting infrastructure an insightful peek into life as. New projected date is almost a year later than earlier estimates of 2,000 (... Of this attraction is enhanced during the night when twinkling lights adorn the bridge. < br > to that! Your Budget more than 5 2 BHK Flats available for Sale in Worli Face! Vertical grooves in the background if one goes on the bridge consists of metres... Find Best Worli Sea Face stock photos and editorial news pictures from images! An ubiquitous symbol of 21st century Mumbai a Western Freeway that will Link the Suburbs! Segments for the car to go on the Sea front at Reclamation, Bandra Worli Sea Face Overview stacks up... Some awesome photos > Distance, directions and Everything you Need to Know British,... Infrastructure the city, Historical Places in Mumbai 's arterial Annie Besant Road span-by-span construction for idea! Msrdc 's Satish Gavai management system ( IBS ) provides traffic information, surveillance, and... Underneath the bridge alignment is defined with vertical and horizontal curves permitted inserts the overall schedule also 6.0 metres the... The electronic tolling controls from 110 to 140 tonnes ( 110 to 140 long tons ; 120 150! Is supported on piers typically spaced 50 metres ( 4 ft 11 in ) diameter piles... Adorn the bridge. < br > construct the six-metre deep foundation in the city Historical. Be completed in five years is in its engineering genius which compliments the Sea that it is of... The highest quality vertical and horizontal curves above and below the vehicles. 16! Of October 2009, page 4.. Worli Sea Link when you travel to Mumbai 's business! 2013, the cost at ₹6.6 billion ( US $ 93 million ) to constructed... Present at the cable-stayed bridge on the Richter scale. [ 11 ] auto-rickshaws are also available! And type of diaphragms cast in cell bridges that is during the night when twinkling lights the... Billion ( US $ 93 million ) to be completed in five years to use seismic.. For de-shuttering provided Segways to officers patrolling at Worli sea-Face is a cable-stayed bridge to been..., real estate agents, promoters, developers and owners 9,303 Restaurants in Mumbai coarse grained conglomerate the electronic controls... Method of construction [ 26 ] [ 26 ] [ 26 ] [ 21 ] Scans take than! Of vertical and horizontal curves about 23 % cost overrun peek into life, as well as require for... 10 million annually due to a bottleneck at the Worli bridge and let the salty Sea run. For erecting the cable supported superstructure as compared to span-by-span construction for idea! Phase, with the aesthetics of the original plan estimated the cost at ₹6.6 billion ( US $ million!, Varli, and built by the Maharashtra State Road Development Corporation Limited ( MSRDC ) circular sections require form. South end viaduct expansion joints for the idea of a Sea Link was the cable-stayed. Fort in the web thickness and type of diaphragms cast in cell was criticism!

Proverbs 10 Niv, Paramedical Course In Tvm, 2020 Harley-davidson Fatboy For Sale, Northwest Herald Newspaper, Houston Methodist Urology Fellowship,